Residents across Mohali woke up to no electricity on Wednesday morning – and the situation is not getting better until at least Saturday. The Punjab State Power Corporation Limited (PSPCL) has published a detailed planned shutdown notice covering power outages from April 22 to April 29, 2026, with Mohali among the worst-hit cities in the state.

The schedule includes IISER Mohali, Sunny Enclave, Sector 123 to 125, Air Force Mohali, GMADA Water Works, Phase 7 to 11, Sector 64, Sector 66, Sector 74, Sector 90 to 91, Landran belt, Behrampur Bet, and Zirakpur-Bhabat-Lohgarh-side areas. The last Mohali-side date visible in the current list is April 28, 2026.
What you need to know
- Most common outage window: 9:00 AM to 5:00 PM
- Most affected belts: Sunny Enclave, industrial Mohali, Landran-side villages, Zirakpur-Bhabat
- Complaint number: 1912
- PSPCL Official website: https://www.pspcl.in/
Mohali power cut schedule for April 23, 24, 25, 26, 27, 28
| Date | Time | Area affected |
|---|---|---|
| 23/04/2026 | 10:00 AM – 5:00 PM | IISER Mohali |
| 24/04/2026 | 9:00 AM – 5:00 PM | New Sunny Enclave, Jandhpur |
| 24/04/2026 | 9:00 AM – 5:00 PM | Sector 125 Mohali |
| 24/04/2026 | 9:00 AM – 5:00 PM | Jandpur, Fartulapur, Hussanpur, Desumajra |
| 24/04/2026 | 9:00 AM – 5:00 PM | Manana, Farthulapur, Bhelolpur |
| 24/04/2026 | 9:00 AM – 5:00 PM | Air Force Mohali |
| 24/04/2026 | 9:00 AM – 5:00 PM | Desumajra, New Sunny Enclave, Gulmohar Complex, Balomajra |
| 24/04/2026 | 9:00 AM – 5:00 PM | Manana, Daun, Thaska, Ramgarh, Jhampur, Desumajra, Bhelolpur |
| 24/04/2026 | 9:00 AM – 5:00 PM | Air Force, Jalvayu Tower, Jandpur Road, New Sunny Enclave, Sector 123, Sector 125 |
| 24/04/2026 | 9:00 AM – 5:00 PM | GMADA Water Works |
| 24/04/2026 | 9:00 AM – 5:00 PM | Shivalika Avenue, Desumajra, Sector 125 |
| 24/04/2026 | 9:00 AM – 2:00 PM | Old Sunny Enclave, Kendriya Vihar side, Chungia Road, Green Market, Budha Park, Gurdwara Sahib side, Sunny Club area |
| 24/04/2026 | 9:00 AM – 2:00 PM | Paradise, Piccadilly Chowk, Kendriya Vihar Road, Lakshay Home, Ekta Vihar, Aroma Homes and adjoining pockets |
| 24/04/2026 | 9:00 AM – 2:00 PM | Palazzo Elite, Jungia Road, 200 Foot Road, Sector 124 Sunny Enclave, Global City, Lovely Ashiyana Villas, Alpine City |
| 24/04/2026 | 9:00 AM – 2:00 PM | Mixed Old and New Sunny Enclave pockets, Amazone City 2, Jungia Road side |
| 24/04/2026 | 9:00 AM – 2:00 PM | Nijjer Road, Santemajra, Chajju Majra, LIC Colony, Model Town, Rajdhani Enclave, Sunny Enclave, Hira Singh Nagar, Azaad Nagar |
| 24/04/2026 | 9:00 AM – 2:00 PM | Mundi Kharar area, Ghumiara Wala Mohalla, Dasmesh Enclave |
| 25/04/2026 | 9:30 AM – 6:30 PM | Bhabat Pind, Palm Enclave, Ram Leela Ground, Jarnail Enclave, New Defence Colony and adjoining area |
| 25/04/2026 | 9:30 AM – 6:30 PM | Lally Dhaba, Mystic Home, Smart Cart, Giri Complex, Shiva Enclave, Zirakpur Market, Bhabat Road, Sehaj Complex, Motia Home and adjoining area |
| 25/04/2026 | 9:30 AM – 6:30 PM | High Land Park, Victoria Enclave, V City, Modern Town and adjoining area |
| 25/04/2026 | 9:30 AM – 6:30 PM | Telephone Exchange Colony, Badal Colony, Dasmesh Colony, Green Enclave, Savitri Apartment, Patiala Road side |
| 25/04/2026 | 10:00 AM – 5:00 PM | Sector 66 Mohali |
| 25/04/2026 | 10:00 AM – 5:00 PM | Sector 64, Phase 10, Housefed |
| 25/04/2026 | 10:00 AM – 5:00 PM | Phase 9 Industrial Area Mohali |
| 25/04/2026 | 10:00 AM – 5:00 PM | NIPER, Phase 11 |
| 25/04/2026 | 10:00 AM – 5:00 PM | Phase 11 and Phase 10 Mohali |
| 25/04/2026 | 10:00 AM – 5:00 PM | Phase 9 Industrial Area, Sector 65A |
| 25/04/2026 | 10:00 AM – 5:00 PM | Phase 11, Sector 48C Mohali |
| 25/04/2026 | 10:00 AM – 5:00 PM | Industrial Area Phase 9, Punwire, Besttech, Swaraj Engine side |
| 26/04/2026 | 10:00 AM – 2:00 PM | Connect, Phase 7 industrial area Mohali |
| 26/04/2026 | 10:00 AM – 5:00 PM | Sector 74, Phase 8B Mohali, industrial area 8B |
| 26/04/2026 | 10:00 AM – 5:00 PM | Industrial Area Phase 8A and 8B Mohali |
| 26/04/2026 | 10:00 AM – 5:00 PM | Sector 74 industrial belt, Phase 8, 8A, 8B |
| 26/04/2026 | 10:00 AM – 5:00 PM | Sector 90 and 91 |
| 26/04/2026 | 10:00 AM – 5:00 PM | Landran, Lakhnaur, Bhagomajra, Bairampur, Moujpur, Manakmajra |
| 27/04/2026 | 9:00 AM – 5:00 PM | Behrampur Bet |
| 28/04/2026 | 9:30 AM – 5:30 PM | Telephone Exchange Colony, Badal Colony, Dasmesh Colony, Green Enclave, Savitri Apartment, Patiala Road and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | Defence Colony, Sigma City 1-2, Sigma City Extension, Lohgarh, near Vishwakarma Mandir and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | Shiva Enclave, Madhuban Home, City Enclave, AKS 3, Unicity Home, near JP Hospital, Green View Heights, AKS 2, Chandigarh Home, Namdhari Tailor, Chandigarh Road side and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | Bhabat Pind, Palm Enclave, Ram Leela Ground, Jarnail Enclave, near Lucky Dhaba, New Defence Colony and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | High Land Park, Victoria Enclave, V City, Modern Town and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | Lally Dhaba, Mystic Home, Smart Cart Chandigarh Road, Midway Hotel, Giri Complex, Shiva Enclave, Goldy Dairy, Zimidara Enclave, Gurdev Nagar, AKS Home, Jarnail Enclave 1-2, Zirakpur Market, Gurmukh Ground, Dhillon Farm, AKS Colony, JP Hospital backside, Bhabat Road, Sehaj Complex, Motia Home, Mudra Sweet and adjoining area |
| 28/04/2026 | 9:30 AM – 5:30 PM | Godown area, Bhabat and adjoining area |
These dates and areas align with the live PSPCL planned outage listing, which currently spans Apr 22 to Apr 29, 2026 and includes the Mohali-side entries through Apr 28.

Most important dates for Mohali Power Cuts
| Date | Why it matters |
|---|---|
| April 23 | Light Mohali schedule, but IISER Mohali is listed |
| April 24 | Major Sunny Enclave and Sector 123-125 shutdown day |
| April 25 | Heavy impact on industrial Mohali and Zirakpur-Bhabat belt |
| April 26 | Strong impact in Phase 7, 8A, 8B, Sec 74, Sec 90-91, Landran side |
| April 27 | Behrampur Bet listed |
| April 28 | Long daytime outages across Bhabat, Lohgarh, Defence Colony, Patiala Road, Zirakpur Market side |
Bottom line
The corrected Mohali power cut schedule for your article should start from April 23 and end on April 28, 2026. The biggest reader takeaway is simple: April 24, April 25, April 26 and April 28 are the heaviest shutdown days for Mohali-side residential, industrial and Zirakpur-linked areas.
What is the latest Mohali power cut schedule?
The latest Mohali power cut schedule in this update runs from April 23 to April 28, 2026, with different outages planned across Sunny Enclave, Sector 123 to 125, industrial Mohali, Landran belt, Zirakpur, Bhabat and Lohgarh.
Is there a power cut in Mohali tomorrow?
Yes, if you are checking for the next listed shutdown from this schedule, outages begin from April 23, 2026, and continue area-wise through April 28, 2026.
Which Mohali areas are affected by the power cut schedule?
The main affected areas include IISER Mohali, New Sunny Enclave, Old Sunny Enclave, Sector 123, Sector 124, Sector 125, Air Force Mohali, GMADA Water Works, Phase 7, Phase 8A, Phase 8B, Phase 9, Phase 10, Phase 11, Sector 64, Sector 66, Sector 74, Sector 90, Sector 91, Landran and Behrampur Bet.
Which day has the biggest power cut in the Mohali region?
The heaviest outage days are April 24, April 25, April 26 and April 28, because these dates cover the largest number of Mohali, industrial and Zirakpur-side locations.
Are Zirakpur and Bhabat included in the Mohali power cut schedule?
Yes. The schedule includes Zirakpur Market, Bhabat Pind, Palm Enclave, Defence Colony, Lohgarh, Patiala Road-side pockets and nearby adjoining areas.
What are the usual power cut timings in Mohali?
Most listed outages fall between 9:00 AM and 5:00 PM, though some areas are scheduled for 9:30 AM to 5:30 PM, 9:30 AM to 6:30 PM, or shorter windows such as 10:00 AM to 2:00 PM.
Why is there a power cut in Mohali?
The shutdowns are part of planned maintenance and power distribution upgrade work, according to the official outage listing and related reports.
Is Sector 125 Mohali on the power cut list?
Yes. Sector 125 Mohali is listed in the outage schedule, especially on April 24 along with nearby Sunny Enclave and Jandpur-side areas.
Is Sunny Enclave affected by the Mohali power cut schedule?
Yes. Both Old Sunny Enclave and New Sunny Enclave appear multiple times in the scheduled outage list.
How can residents complaint a power outage in Mohali?
Residents can call 1912 to register electricity supply-related complaints.
